Elinwa, A U and Buba, S A (1993) Construction Cost Factors in Nigeria. Journal of Construction Engineering and Management, 119(04), 698–713.

Hastak, M, Vanegas, J A and Puyana‐Camargo, M (1993) Time‐Based Competition: Competitive Advantage Tool for A/E/C Firms. Journal of Construction Engineering and Management, 119(04), 785–800.

Howell, G, Laufer, A and Ballard, G (1993) Interaction between Subcycles: One Key to Improved Methods. Journal of Construction Engineering and Management, 119(04), 714–28.

Moselhi, O and El‐Rayes, K (1993) Scheduling of Repetitive Projects with Cost Optimization. Journal of Construction Engineering and Management, 119(04), 681–97.

Navon, R, Kelly, P W and Johnston, D W (1993) Human Factors in Introducing On‐Site Construction Automation. Journal of Construction Engineering and Management, 119(04), 801–12.

O'Connor, J T and Caraway, P H (1993) Need for Specification Format that Accommodates Engineered Projects. Journal of Construction Engineering and Management, 119(04), 757–68.

Ohura, T and Kato, M (1993) Erection and Field Test of Concrete Arch Bridge Applying Composite Tube. Journal of Construction Engineering and Management, 119(04), 666–80.

  • Type: Journal Article
  • Keywords: Bridges, arch; Composite structures; Steel; Concrete; Tubes; Bridge construction; Linings; Field tests;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1993)119:4(666)
  • Abstract:
    The concrete arch ribs of the JŌshi Bridge were constructed by a new erection method called the concrete lining method with preerected composite arch (CLCA method). In this method, tubular steel arches are first erected. Next, concrete is filled into the steel tubes to form a composite arch. Finally, the concrete‐filled steel tubes are used like falsework and are encased in reinforced concrete to form the finished arch rib. Because the composite arch has excellent resistance against axial compression, the amount of steel used can be significantly reduced compared to conventional arch center and Melan arch methods. In this paper, the construction of the JŌshi Bridge and the results of performance tests at each stage of the arch rib construction are described. In addition, the design technique of this method is discussed based on the test results.

Paek, J H, Lee, Y W and Ock, J H (1993) Pricing Construction Risk: Fuzzy Set Application. Journal of Construction Engineering and Management, 119(04), 743–56.

Parfitt, M K, Syal, M G, Khalvati, M and Bhatia, S (1993) Computer‐Integrated Design Drawings and Construction Project Plans. Journal of Construction Engineering and Management, 119(04), 729–42.

Radtke, M W and Russell, J S (1993) Project‐Level Model Process for Implementing Constructability. Journal of Construction Engineering and Management, 119(04), 813–31.

Russell, J S and Gugel, J G (1993) Comparison of Two Corporate Constructability Programs. Journal of Construction Engineering and Management, 119(04), 769–84.

Severson, G D, Jaselskis, E J and Russell, J S (1993) Trends in Construction Contractor Financial Data. Journal of Construction Engineering and Management, 119(04), 854–8.

Shah, D D, Jain, S K and Prybella, R W (1993) Performance of Remotely Controlled Fiberglass Pipe Jacking System. Journal of Construction Engineering and Management, 119(04), 832–51.